Projects

Church of Jesus Christ – Grenoble

Church of Jesus Christ – Grenoble

NATURE – Construction of a place of worshipCLIENT – Church of Jesus Christ of Latter-day SaintsCOST – €4,500,000 excl. VATDATE – Delivered in 2019LOCATION – Grenoble – Cours de la LibérationAREA – 1,130 m² floor areaSCOPE – Basic + DQE (excluding OPC /...

National Museum – Belgrade, Serbia

National Museum – Belgrade, Serbia

NATURE – Extension and restructuring of the National Museum of BelgradeCLIENT – National Museum – Serbian Ministry of CultureCOST – Approx. €80,000,000 excl. VATCOMPETITION – Not selectedLOCATION – Belgrade, SERBIAAREA – Approx. 12,000 m²SCOPE – Concept design...

Contemporary Villa – Brié-et-Angonnes (38), Isère

Contemporary Villa – Brié-et-Angonnes (38), Isère

NATURE – Construction of a contemporary villaCLIENT – Private clientDATE – 2011LOCATION – Brié-et-Angonnes (38)AREA – 190 m² GFASCOPE – Basic MOP + OPC – interior architecture and fittings FEATURES – Single-storey villa; traditional construction with masonry structure...

Clos Garibaldi Housing Development – Grenoble (38)

Clos Garibaldi Housing Development – Grenoble (38)

NATURE – Development of terraced single-family housesCLIENT – Grenoble HabitatCOST – €1,269,620 excl. VATLOCATION – Grenoble (38)AREA – 1,264 m² GFASCOPE – Basic MOP + OPCFEATURES – Construction of 12 terraced villas, type T4 + garage, two-storey layout (approx. 110...

“Le Domaine des Poètes” Residence – Rumilly (74)

“Le Domaine des Poètes” Residence – Rumilly (74)

NATURE – Construction of a collective housing residence for home ownershipCLIENT – Patrick GAILLARD & AssociésCOST – €3,812,000 excl. VATCOMPETITION – NoneLOCATION – Rumilly (74)AREA – 4,221 m² gross floor areaSCOPE – Building permit, tender documents, sales plans...

Le Jardin Alpin Residence – Vaujany (38)

Le Jardin Alpin Residence – Vaujany (38)

NATURE – Construction of a collective housing residence for home ownershipCLIENT – SCI de l’AlpetteCOST – €5,220,750 excl. VATCOMPETITION – Private consultationLOCATION – Vaujany (38)AREA – 2,919 m² gross floor areaSCOPE – Basic MOP + OPCHQE – NoneFEATURES – 3...

Le Filaos Student Residence – ZAC de Bonne, Grenoble (38)

Le Filaos Student Residence – ZAC de Bonne, Grenoble (38)

NATURE – Construction of a student residence with retail units and parkingCLIENT – Grenoble HabitatCOST – €4,318,600 excl. VATLOCATION – ZAC de Bonne – Grenoble (38)AREA – 3,588 m² gross floor areaSCOPE – Basic MOP + execution phasesHQE – HQE approach aligned with the...

Les Terrasses de Beauregard Residence – La Ravoire (73)

Les Terrasses de Beauregard Residence – La Ravoire (73)

NATURE – Construction of a collective housing residence for home ownershipCLIENT – Dumas-Lattaque RéalisationsCOST – €2,668,750 excl. VATCOMPETITION – NoneLOCATION – La Ravoire (73)AREA – 2,945 m² gross floor areaSCOPE – Building permit, tender documents, sales plans,...

Côté Parc Residence – ZAC Périaz, Seynod (74)

Côté Parc Residence – ZAC Périaz, Seynod (74)

NATURE – Construction of a collective housing residence for home ownershipCLIENT – Résidences Bernard TeillaudCOST – €5,852,000 excl. VATCOMPETITION – NoneLOCATION – ZAC Périaz – Seynod (74)AREA – 4,832 m² gross floor areaSCOPE – Building permit, tender documents,...

Le Galilée Residence – Eybens (38)

Le Galilée Residence – Eybens (38)

NATURE – Construction of a collective social housing residenceCLIENT – OPAC 38COST – €2,300,000 excl. VATLOCATION – Eybens (38)AREA – 2,032 m² gross floor areaSCOPE – Basic MOP + OPCHQE – Partial HQE approach – BBC energy performance levelFEATURES – 29 social rental...

Le Nouveau Mail Residence – Fontaine (38)

Le Nouveau Mail Residence – Fontaine (38)

NATURE – Construction of the “Le Nouveau Mail” complex: social homeownership and rental housing + OPAC office spaceCLIENT – OPAC38 / DauphilogisCOST – €3,260,000 excl. VATCOMPETITION – Negotiated contractLOCATION – Fontaine (38)AREA – 3,012 m² GFASCOPE – Basic MOP +...

Tendance Sud Residence – Grenoble (38)

Tendance Sud Residence – Grenoble (38)

NATURE – Construction of a collective housing residence for home ownershipCLIENT – Gilles TRIGNAT RésidencesCOST – €1,859,200 excl. VATCOMPETITION – NoneLOCATION – Grenoble (38)AREA – 1,578 m² GFASCOPE – Building permit, tender documents, sales plansHQE – Solar...

Lepic Residence – Aix-les-Bains (73)

Lepic Residence – Aix-les-Bains (73)

NATURE – Construction of a residential building with 40 collective housing unitsCLIENT – OPAC de la SavoieCOST – €3,700,000 excl. VATCOMPETITION – Sketch design competition – not selectedLOCATION – Aix-les-Bains (73) – Boulevard LepicAREA – 2,622 m² gross floor area –...

Le Reposoir Eco-Neighbourhood – Aix-les-Bains (73)

Le Reposoir Eco-Neighbourhood – Aix-les-Bains (73)

NATURE – Construction of an eco-neighbourhood with 35 individual housing unitsCLIENT – OPAC de la SavoieCOST – €3,724,000 excl. VATCOMPETITION – Sketch design competition, winnerLOCATION – Aix-les-Bains – Le ReposoirAREA – 2,862 m² gross floor areaSCOPE – Basic MOPHQE...

IMT Boarding Tower – Grenoble (38)

IMT Boarding Tower – Grenoble (38)

NATURE – Refurbishment of the IMT boarding accommodation towerCLIENT – Grenoble Chamber of Commerce and Industry (CCI Grenoble)COST – €3,600,000 excl. VATCOMPETITION – Negotiated contractLOCATION – Grenoble (38)AREA – 3,703 m² – 136 bedsSCOPE – Basic MOP + diagnostics...

Les Terrasses de Rochebrune Residence – Voreppe (38)

Les Terrasses de Rochebrune Residence – Voreppe (38)

NATURE – Construction of a residential complex with social rental and ownership housingCLIENT – SDH and Dumas-Lattaque RéalisationsCOST – €7,067,000 excl. VATCOMPETITION – Negotiated contractLOCATION – Voreppe (38)AREA – Social rental housing: 1,436 m² floor area–...

Oxygène Student Residence – Presqu’île, Grenoble (38)

Oxygène Student Residence – Presqu’île, Grenoble (38)

NATURE – Construction of a student residence with 112 units (T1 and T2)CLIENT –SAIEM Grenoble HabitatCOST – €4,884,000 excl. VATDATE – Delivered in 2016LOCATION –Grenoble – Presqu’île (38)AREA – 3,763 m² floor areaSCOPE – Basic MOP + execution phasesHQE – Global HQE...

ZAC Châtelet Housing – Grenoble (38)

ZAC Châtelet Housing – Grenoble (38)

NATURE – 68 collective housing units: a mix of affordable homeownership and social rental units / daycare centre / community facilitiesCLIENT –Epergos Habitat / Amalia / SDH COST – €7,630,560 excl. VATDATE – Design competition, 2015LOCATION –Grenoble (38)AREA – 5,476...

Ypérion Residence – Collective housing in Valence (26)

Ypérion Residence – Collective housing in Valence (26)

NATURE – Construction of a mixed-use complex with 65 condominium apartments, ground-floor retail and two-level car park with 98 spacesCLIENT – SDH ConstructeurCOST – €8,700,000 excl. VATDATE – Sketch design competition, winner – delivery in progressLOCATION – Valence...

Early Childhood and School Hub – Le Sappey (38)

Early Childhood and School Hub – Le Sappey (38)

NATURE – Extension and restructuring of the early childhood and school hubCLIENT – Municipality of Le Sappey-en-ChartreuseCOST – €2,390,000 excl. VATCOMPETITION – Sketch design; not selectedLOCATION – Le Sappey (38)AREA – 1,340 m² refurbished GFA; 990 m² new build...

Grenoble École de Management – Grenoble (38)

Grenoble École de Management – Grenoble (38)

NATURE – Construction of an office tower and a pedagogical auditorium for Grenoble École de ManagementCLIENT – Grenoble Chamber of Commerce and Industry (CCI Grenoble)COST – €10,443,886 excl. VATLOCATION – Grenoble (38)AREA – 5,470 m²SCOPE – Basic MOP + execution...

Porte des Alpes Vocational High School – Rumilly (74)

Porte des Alpes Vocational High School – Rumilly (74)

NATURE – Extension and refurbishment of the Porte des Alpes vocational high schoolCLIENT – Rhône-Alpes RegionCOST – €11,225,546 excl. VATCOMPETITION – WinnerLOCATION – Rumilly (74)AREA – Refurbishment: 13,500 m² GFA – Extension: 4,406 m² GFA – Total: 17,910 m²...

Crussol Secondary School – Saint-Péray (07)

Crussol Secondary School – Saint-Péray (07)

NATURE – Extension and refurbishment of the Crussol secondary schoolCLIENT – Ardèche Departmental CouncilCOST – €4,130,551 excl. VATCOMPETITION – WinnerLOCATION – Saint-Péray (07)AREA – Extension: 2,000 m² GFA – Refurbishment: 2,637 m² GFASCOPE – Basic MOP + execution...

Marius Gros Primary School – Quincieux (69)

Marius Gros Primary School – Quincieux (69)

NATURE – Construction of a primary schoolCLIENT – Municipality of QuincieuxCOST – €1,718,567 excl. VATCOMPETITION – WinnerLOCATION – Quincieux (69)AREA – 1,712 m² GFASCOPE – Basic MOP + execution phasesFEATURES – 10-class primary school with a capacity of 250 pupils–...

Le Petit Prince School Complex – Vétraz-Monthoux (74)

Le Petit Prince School Complex – Vétraz-Monthoux (74)

NATURE – Construction of a kindergarten and primary school complexCLIENT – Municipality of Vétraz-MonthouxCOST – €3,653,306 excl. VATCOMPETITION – WinnerLOCATION – Vétraz-Monthoux (74)AREA – 2,390 m² GFA – 10 classroomsSCOPE – Basic MOP + partial execution + fire...

Louis Mauberret Secondary School – La Mure (38)

Louis Mauberret Secondary School – La Mure (38)

NATURE – Extension and refurbishment of the Louis Mauberret secondary schoolCLIENT – Ardèche Departmental CouncilCOST – €4,349,500 excl. VATLOCATION – La Mure (38)AREA – 6,278 m² refurbished / 1,392 m² extension – total GFA: 7,670 m²SCOPE – Basic MOP + execution...

Champ-Fleuri Secondary School – Bourgoin-Jallieu (38)

Champ-Fleuri Secondary School – Bourgoin-Jallieu (38)

NATURE – Extension and restructuring of the Champ-Fleuri secondary schoolCLIENT – Isère Departmental CouncilCOST – €11,633,657 excl. VATDATE – Delivered in 2011LOCATION – Bourgoin-Jallieu (38)AREA – 10,474 m² GFA (refurbishment: 8,488 m², extension: 1,985 m²)SCOPE –...

Cité des Territoires – Grenoble (38)

Cité des Territoires – Grenoble (38)

NATURE – Construction of an extension building for the Cité des TerritoiresCLIENT – Joseph Fourier University and Pierre Mendès France UniversityCOST – €3,600,000 excl. VATCOMPETITION – Sketch design – not selectedLOCATION – Grenoble (38)AREA – 2,108 m² usable floor...

Mi-Plaine School Complex – Saint-Priest (69)

Mi-Plaine School Complex – Saint-Priest (69)

NATURE – Extension and restructuring of the Mi-Plaine school complexCLIENT – Municipality of Saint-PriestCOST – €5,178,000 excl. VATCOMPETITION – WinnerLOCATION – Saint-Priest (69)AREA – 2,654 m² floor areaSCOPE – Basic MOP + execution phases + site supervision...

Paul Langevin Kindergarten – Saint-Martin-d’Hères (38)

Paul Langevin Kindergarten – Saint-Martin-d’Hères (38)

NATURE – Reconstruction of the Paul Langevin kindergartenCLIENT – Municipality of Saint-Martin-d’HèresCOST – €2,877,387 excl. VATCOMPETITION – WinnerLOCATION – Saint-Martin-d’Hères (38)AREA – 1,485 m² GFASCOPE – Basic MOP + execution phases + site supervision (OPC)HQE...

Institut des Métiers et des Techniques – Grenoble (38)

Institut des Métiers et des Techniques – Grenoble (38)

NATURE – Construction of a vocational training building – CFA (Apprentice Training Centre)CLIENT – Grenoble Chamber of Commerce and Industry (CCI Grenoble)COST – €5,111,233 excl. VATCOMPETITION – WinnerLOCATION – IMT – Grenoble (38)AREA – 3,260 m² GFASCOPE – Basic MOP...

La Tuilerie School Complex – Épagny (74)

La Tuilerie School Complex – Épagny (74)

NATURE – Construction of a new school complexCLIENT – Municipality of ÉpagnyCOST – €6,762,444 excl. VATDATE – Delivered in 2017LOCATION – Épagny (74)AREA – 2,794 m² usable floor areaSCOPE – Basic MOP including execution phases + fire safety systems + site...

Françoise Dolto School Complex – Vétraz-Monthoux (74)

Françoise Dolto School Complex – Vétraz-Monthoux (74)

NATURE – Extension of the school complex to create a 6-classroom kindergartenCLIENT – Municipality of Vétraz-MonthouxCOST – €2,330,000 excl. VATCOMPETITION – Sketch+ design, winnerLOCATION – Vétraz-Monthoux (74)AREA – 1,200 m² GFASCOPE – Basic MOP with execution...

ALAÏ School Complex – Tassin-la-Demi-Lune (69)

ALAÏ School Complex – Tassin-la-Demi-Lune (69)

NATURE – Demolition – asbestos removal – reconstruction of the ALAÏ school complexCLIENT – Municipality of Tassin-la-Demi-LuneCOST – €4,542,992 excl. VATDATE – Delivered in 2015LOCATION – Francheville – Tassin-la-Demi-LuneSURFACE – 2.550m² SHONSCOPE – Basic MOP +...

Camille Vernet School Campus – Valence (26)

Camille Vernet School Campus – Valence (26)

NATURE – Partial demolition and reconstruction of the secondary school, science centre, and arts/music/theatre hubCLIENT – Rhône-Alpes RegionCOST – €13,380,000 excl. VATCOMPETITION – Sketch+ design; winner; delivered in 2023LOCATION – Valence (26)AREA – 7,191 m² gross...

Secondary School and Gymnasium – Champier (38)

Secondary School and Gymnasium – Champier (38)

NATURE – Construction of a new secondary school and its sports facilitiesCLIENT – Isère Departmental CouncilCOST – €13,750,000 excl. VATDATE – Design competition, 2017LOCATION – Champier (38)AREA – School: 5,568 m² GFA – Gymnasium: 1,589 m² GFASCOPE – Basic MOP +...

Flora Saunier School Complex – Anthy-sur-Léman (74)

Flora Saunier School Complex – Anthy-sur-Léman (74)

NATURE – Construction of a new school complex with 12 classrooms, canteen and after-school facilitiesCLIENT – Municipality of Anthy-sur-LémanCOST – €5,520,000 excl. VATCOMPETITION – Sketch design, winner; delivered in 11-2020LOCATION – Anthy-sur-Léman (74)AREA – 2,710...

Mirabeau School Complex – Mirabeau (84)

Mirabeau School Complex – Mirabeau (84)

NATURE – Construction of a new 7-classroom school complex with canteen, BDM Gold certifiedCLIENT – Municipality of MirabeauCOST – €4,198,000 excl. VATCOMPETITION – Sketch+ design, winner in 07-2019, delivered in 08-2023LOCATION – Mirabeau (84)AREA – 1,433 m² usable...

La Glacière School Complex – Oullins (69)

La Glacière School Complex – Oullins (69)

NATURE – Restructuring and extension of the “La Glacière” school complexCLIENT – City of OullinsCOST – €3,775,000 excl. VATCOMPETITION – Sketch design, winner in 10-2018, delivered in 12-2022LOCATION – Oullins (69)AREA – Total 2,404 m² floor area, including 1,321 m²...

Collège Édouard Vaillant – Saint-Martin-d’Hères (38)

Collège Édouard Vaillant – Saint-Martin-d’Hères (38)

NATURE – Restructuring of Collège Édouard VaillantCLIENT – Département de l’IsèreCOST – €15,400,000 excl. VATDATE – Works in progress, multi-phase project; expected delivery 10-2026LOCATION – Saint-Martin-d’Hères (38)AREA – 7,473 m² floor areaSCOPE – Basic MOP +...

Clinique des Cèdres – Échirolles (38)

Clinique des Cèdres – Échirolles (38)

NATURE – Construction of the Clinique des Cèdres and adjacent medical centreCLIENT – Clinique des CèdresCOST – €32,020,000 excl. VATDATE – Sketch design competition, winner; delivered in 09-2006 LOCATION – Échirolles (38)AREA – 19,299 m² GFASCOPE – Basic MOPFEATURES –...

Regional University Maternity – Nancy (54)

Regional University Maternity – Nancy (54)

NATURE – Extension of the Regional University MaternityCLIENT – Regional University MaternityCOST – €13,000,000 excl. VATCOMPETITION – Design & build, not awarded – 2nd placeLOCATION – Nancy (54)AREA – 7,161m² GFASCOPE – Design & build – basic MOP +...

Psychiatric Hospital – Saint-Egrève (38)

Psychiatric Hospital – Saint-Egrève (38)

NATURE – Creation of two admission unitsCLIENT – Saint-Egrève Hospital CenterCOST – €5,900,000 excl. VATDATE – Design-and-build competition, winner – delivered in 09.2009LOCATION – Saint-Egrève (38)AREA – 3,835 m² GFASCOPE – Basic design + ExecutionHQE – Not...

EHPAD Dolcéa Jardins Médicis – Saint-Péray (07)

EHPAD Dolcéa Jardins Médicis – Saint-Péray (07)

NATURE – Construction of the “Dolcéa Jardins Médicis” nursing homeCLIENT – GDP Vendôme PromotionCOST – €4,209,214 excl. VATDATE – Delivered in 02-2013LOCATION – Saint-Péray (07)AREA – 3,340 m² GFASCOPE – Basic MOPHQE – High Energy Performance (THPE) levelFEATURE – 56...

EHPA “Résidence Les Bains” – Grenoble (38)

EHPA “Résidence Les Bains” – Grenoble (38)

NATURE – Redevelopment of the former Clinique des Bains site – demolition – construction of an EHPACLIENT – GDP POPCOST – €6,973,000 excl. VATDATE – Private consultation without competition; delivered in 07-2012LOCATION – Grenoble (38)AREA – 4,900 m² GFASCOPE – Basic...

Jean Jannin Medical Care Home – Les Abrets (38)

Jean Jannin Medical Care Home – Les Abrets (38)

NATURE – Extension and restructuring of the Jean Jannin medical care homeCLIENT – FAM Jean JanninCOST – €4,900,000 excl. VATDATE – Sketch design competition – winner in 04-2015 / works in progressLOCATION – Les Abrets (38)AREA – 5,170 m² usable floor area: 1,795 m²...

NURSING HOME – ZAC Flaubert, Grenoble (38)

NURSING HOME – ZAC Flaubert, Grenoble (38)

NATURE – Construction of an 84-bed nursing home including 28 beds in an Alzheimer’s care unitCLIENT – ACTISCOST – €10,630,000 excl. VATDATE – Competition winner in 11/2017 – delivered in 07/2022LOCATION – Grenoble (38)AREA – 5,280 m² GFASCOPE – Basic + Visa + Exe1 +...

New Nursing Home – Gières (38)

New Nursing Home – Gières (38)

NATURE – Construction of a 90-bed nursing home, including 42 beds in an Alzheimer’s or related disorders unitCLIENT – ORSACCOST – €7,650,000 excl. VATDATE – Competition winner in 09-2018 – studies in progressLOCATION – Gières (38)AREA – 5,000 m² GFASCOPE – Basic...

EHPAD Alzheimer “La Maison” – Voreppe (38)

EHPAD Alzheimer “La Maison” – Voreppe (38)

NATURE – Extension and restructuring of the EHPAD Alzheimer “La Maison”CLIENT – Centre Hospitalier de Voiron and EHPAD de VoreppeCOST – €2,047,570 excl. VATDATE – Architectural design competition, winner – delivered in 04-2014LOCATION – Voreppe (38)AREA – 1,355 m² GFA...

“Le Doyen” Parking – Europole – Grenoble (38)

“Le Doyen” Parking – Europole – Grenoble (38)

NATURE – Construction of a public parking facilityCLIENT – City of GrenobleCOST – €4,725,000 excl. VATCOMPETITION – WinnerLOCATION – Grenoble (38)AREA – 12,000 m² GFA, 400 spacesSCOPE – Basic MOP mission + Execution + Coordination + Fire Safety System +...

Stade des Alpes Parking – Grenoble (38)

Stade des Alpes Parking – Grenoble (38)

NATURE – Construction of the Stade des Alpes parking facilityCLIENT – City of GrenobleCOST – €9,980,000 excl. VATCOMPETITION – WinnerLOCATION – Grenoble (38)AREA – 14,360 m² GFA – 440 spacesSCOPE – Basic MOP + ExecutionFEATURE – Semi-underground parking...

“Les Tisserands” Parking – Voiron (38)

“Les Tisserands” Parking – Voiron (38)

NATURE – Construction of a silo-type car parkCLIENT – City of VoironCOST – €4,450,000 excl. VATCOMPETITION – WinnerLOCATION – Voiron (38)AREA – 11,827 m² GFA, 469 parking spacesSCOPE – Basic MOP + Execution

Modular Silo Car Park – Moirans (38)

Modular Silo Car Park – Moirans (38)

NATURE – Construction of a 3-level modular silo car parkCLIENT – CAPVCOST – €3,795,236 excl. VATDATE – Design competition (sketch phase) – winner; delivered in 05-2017LOCATION – Moirans, train station districtAREA – 408 parking spacesSCOPE – Basic MOP mission + OPC +...

Silo car park – ZAC Flaubert, Grenoble (38)

Silo car park – ZAC Flaubert, Grenoble (38)

NATURE – Construction of a silo car park incorporating concierge service premises, a café-restaurant, and development of a rooftop terrace for urban farmingCLIENT – Grenoble HabitatCOST – €3,500,000 excl. VATCOMPETITION – Esquisse+ design competition; not...

Parking superstructure – Les Deux Alpes (38)

Parking superstructure – Les Deux Alpes (38)

NATURE – Construction of a superstructure parking facility with 307 spaces on 4 split levelsCLIENT – Municipality of Les Deux AlpesCOST – €7,200,000 excl. VATDATE – Sketch design competition – not selected; competition held in 01-2019LOCATION – Les Deux Alpes (38)AREA...

Fleming Gymnasium – Sassenage (38)

Fleming Gymnasium – Sassenage (38)

NATURE – Construction of a gymnasium and outdoor sports area CLIENT – SIRD COST – €4,000,045 excl. VATCOMPETITION – Not selectedLOCATION – Sassenage (38) AREA – 2,600 m² GFASCOPE – Basic MOP missionHQE – Yes – BBC (Low-Energy Building) certifiedFEATURE – Creation of a...

MINATEC – Technical Operations Facility – Grenoble (38)

MINATEC – Technical Operations Facility – Grenoble (38)

NATURE – Construction of a Technical Operations Facility at the MINATEC CentreCLIENT – CEA GrenobleCOST – €11,300,000 excl. VATLOCATION – Grenoble (38)AREA – 4,915 m² GFASCOPE – Basic MOP mission + Execution studies + Site supervision (OPC)FEATURE – Technical...

SEW USOCOM – Service Centre – Vaulx-Milieu (38)

SEW USOCOM – Service Centre – Vaulx-Milieu (38)

NATURE – Construction of a SEW USOCOM service centreCLIENT – PrivateCOST – €3,100,000 excl. VATCOMPETITION – Sketch design competition, not selectedLOCATION – Vaulx-Milieu (38)AREA – 2,310 m² usable floor areaSCOPE – Basic + detailed design + construction...

Nano-Safety Platform – CEA – Grenoble (38)

Nano-Safety Platform – CEA – Grenoble (38)

NATURE – Construction of a nano-safety platform – CEACLIENT – CEA COST – €13,200,000 excl. VATCOMPETITION – Design & build – not awardedLOCATION – Grenoble (38)SURFACE - 3.900m² SU - 7.035m² SDO SCOPE – Design & buildHQE – NoneFEATURE – Integration and...

CEA LETI 41 “Les Tétines” – Grenoble (38)

CEA LETI 41 “Les Tétines” – Grenoble (38)

NATURE – Extension of the LETI 41 “Les Tétines” building – CEACLIENT – CEACOST – €700,000 excl. VATCOMPETITION – Sketch design – WinnerLOCATION – Grenoble (38)AREA – 289 m² GFASCOPE – Design and construction – basic services without site supervisionFEATURE – Creation...

Audi Dealership – Montagnat Bourg-en-Bresse (01)

Audi Dealership – Montagnat Bourg-en-Bresse (01)

NATURE – Construction of an Audi dealership CLIENT – Europe Garage COST – €3,300,000 excl. VAT DATE – Delivered in 2014 LOCATION – Montagnat Bourg-en-Bresse (01) AREA – 4,275 m² GFA SCOPE – Basic MOP mission with visa + OPCHQE – Not applicable FEATURE – 473 m²...

Audi Dealership – Échirolles (38)

Audi Dealership – Échirolles (38)

NATURE – Extension and restructuring of the Audi car dealership CLIENT – SIC-1 COST – €3,500,000 excl. VAT LOCATION – Echirolles (38) AREA – 5,109 m² GFA: 1,440 m² existing, 3,629 m² extensionSCOPE – Basic MOP mission + OPCFEATURE – Various areas: new vehicle showroom...

Audi Dealership – Mâcon (71)

Audi Dealership – Mâcon (71)

NATURE – Refurbishment and extension of an existing building for an approved Audi dealership and repair centreCLIENT – Immobilière des CîmesCOST – €1,700,000 excl. VATCOMPETITION – NoLOCATION – Mâcon (71)AREA – Total GFA: 2,487 m²; extension: 200 m² – refurbishment:...

Leclerc Hypermarket Comboire – Échirolles (38)

Leclerc Hypermarket Comboire – Échirolles (38)

NATURE – Extension and renovation of the Leclerc Comboire hypermarket with the addition of a silo car parkCLIENT – SA Leclerc DistributionCOST – €22,854,370 excl. VATLOCATION – Echirolles (38)AREA – 30,000 m² GFA existing, 7,560 m² GFA extensionSCOPE – Basic MOP...

Electronic Data Transfer Offices – Montbonnot

Electronic Data Transfer Offices – Montbonnot

NATURE – Construction of the Electronic Data Transfer officesCLIENT – EDTCOST – €603,711 excl. VATLOCATION – Montbonnot (38)AREA – 778 m² GFA (Gross Floor Area)SCOPE – Basic MOP mission + site management (OPC)

Tax Office – Social Services Branch – Grenoble (38)

Tax Office – Social Services Branch – Grenoble (38)

TYPE – Extension of the Tax Office, creation of the Social Services BranchCLIENT – French Tax Authority (Direction Générale des Impôts)COST – €259,163 excl. VATLOCATION – Grenoble (38)AREA – 225 m² GFA (Gross Floor Area)SCOPE – Basic MOP (standard public procurement...

Gendarmerie Barracks – Sassenage (38)

Gendarmerie Barracks – Sassenage (38)

NATURE – Construction of a gendarmerie barracks with housing unitsCLIENT – City of SassenageCOST – €1,585,000 excl. VATCOMPETITION – WinnerLOCATION – Sassenage (38)AREA – 2,071 m² GFASCOPE – Basic MOP mission + Execution studies + OPCFEATURE – Gendarmerie: 384 m² GFA,...

Gendarmerie Barracks – Voreppe (38)

Gendarmerie Barracks – Voreppe (38)

NATURE – Construction of a gendarmerie barracks with housing unitsCLIENT – City of VoreppeCOST – €1,368,033 excl. VATCOMPETITION – WinnerLOCATION – Voreppe (38)AREA – 2,002 m² GFASCOPE – Basic MOP mission + Execution studies + OPCSCOPE – Basic MOP mission + Execution...

Grenoble School of Management – Grenoble (38)

Grenoble School of Management – Grenoble (38)

NATURE – Construction of an office tower and lecture hall for educational use – Grenoble School of ManagementCLIENT – CCI GrenobleCOST – €10,443,886 excl. VATLOCATION – Grenoble (38)AREA – 5,470 m²SCOPE – Basic MOP mission + Execution studies + Cost controlFEATURE –...

A. Raymond Holding – Grenoble (38)

A. Raymond Holding – Grenoble (38)

NATURE – Construction of ARaymond’s global headquartersCLIENT – RAYGROUP SASUCOST – €5,650,000 excl. VATCOMPETITION – Conceptual sketch competition – not selected, 2nd placeLOCATION – Grenoble – BerriatAREA – 3,010 m² GFASCOPE – Project managementHQE – HQE approach,...

Gendarmerie Barracks – Rumilly (74)

Gendarmerie Barracks – Rumilly (74)

NATURE – Construction of a gendarmerie barracks including offices, technical facilities, garages and housing unitsCLIENT – City of RumillyCOST – €3,632,000 excl. VATCOMPETITION – Sketch design under BEA procedure, winnerLOCATION – Rumilly (74)AREA – 380 m² GFA...

New Headquarters of La Métro – Grenoble (38)

New Headquarters of La Métro – Grenoble (38)

NATURE – Renovation of the existing “Le Forum” building and extension to create a tertiary complex – headquarters of Grenoble Alpes Métropole. Consolidation of metropolitan administrative and shared services. CLIENT – Grenoble Alpes MétropoleCOST – €60,000,000 excl....

Occupational Health Center “Métrazif” – Fontaine (38)

Occupational Health Center “Métrazif” – Fontaine (38)

NATURE – Construction of an office and medical consultation building for occupational health servicesCLIENT – METRAZIFCOST – €1,376,558 excl. VATDATE – Delivered in 05/2019LOCATION – Fontaine (38)AREA – 580 m² usable floor area (UFA)SCOPE – Lead architect, basic...

Pathé Multiplex Cinema – Valence – 2000

Pathé Multiplex Cinema – Valence – 2000

NATURE – Multiplex cinemaCLIENT – Pathé CinémaCOST – €7,211,000 excl. VATLOCATION – Valence (26)AREA – 6,300 m² GFASCOPE – Architectural design and assistanceFEATURE – 12 screens; 2,350 seats

Pathé Multiplex Cinema – Échirolles

Pathé Multiplex Cinema – Échirolles

NATURE – Multiplex cinemaCLIENT – Pathé CinémaCOST – €6,677,270 excl. VATLOCATION – Échirolles (38)AREA – 8,800 m²SCOPE – Basic MOP mission + Execution studies + OPCFEATURE – 12 screens; 2,930 seats

Pathé Multiplex Cinema – Montataire (60)

Pathé Multiplex Cinema – Montataire (60)

NATURE – Construction of a multiplex cinemaCLIENT – Pathé CinémaCOST – €11,451,970 excl. VATLOCATION – Montataire (60)AREA – 13,100 m²SCOPE – Architectural design and assistanceFEATURE – 16 screens; 3,466 seats

L’Odyssée Cultural Center – Eybens (38)

L’Odyssée Cultural Center – Eybens (38)

NATURE – Cultural center – auditorium and media libraryCLIENT – City of EybensCOST – €2,900,000 excl. VATCOMPETITION – WinnerLOCATION – Eybens (38)AREA – 7,200 m² GFA, including 1,460 m² extension and 600 m² renovationSCOPE – Basic MOP mission with visa + quantity...

Urban Leisure Center – Roanne

Urban Leisure Center – Roanne

NATURE – Multiplex cinemaCLIENT – SEDL / City of Roanne / Le MajesticCOST – €21,122,169 excl. VATCOMPETITION – WinnerLOCATION – Roanne (42)AREA – 10,594 m²SCOPE – Basic MOP mission + Execution studies + OPCHQE – NoneFEATURE – 9-screen cinema, 1,924 seats – parking...

Multiplex Cinema – Montbrison (42)

Multiplex Cinema – Montbrison (42)

NATURE – Construction of a cinema complexCLIENT – Montbrison City CouncilCOST – €3,350,000 excl. VATCOMPETITION – Sketch design competition – not selectedLOCATION – Montbrison (42)AREA – 2,990 m² GFASCOPE – Basic MOP mission + Execution studiesFEATURE – 5 screens –...

National Museum of Belgrade – SERBIA

National Museum of Belgrade – SERBIA

NATURE – Extension and restructuring of the National Museum of BelgradeCLIENT – National Museum – Serbian Ministry of CultureCOST – approx. €80,000,000 excl. VATCOMPETITION – Not selectedLOCATION – Belgrade, SERBIAAREA – approx. 12,000 m²SCOPE – Sketch design...

Cultural venue in Monéteau (89)

Cultural venue in Monéteau (89)

NATURE – Construction of a cultural venueCLIENT – Monéteau City CouncilCOST – €3,540,000 excl. VATCOMPETITION – Sketch design competition – not selected, 2nd placeLOCATION – Monéteau (89)AREA – 1,646 m² GFASCOPE – Basic MOP mission + Execution studies + OPC + CEM +...

Pathé Capsud Multiplex Cinema – Avignon (84)

Pathé Capsud Multiplex Cinema – Avignon (84)

NATURE – Extension of the Pathé Capsud multiplex cinemaCLIENT – Pathé Cinéma – EuropalaceCOST – €5,870,000 excl. VATDATE – Delivered in 2013LOCATION – Avignon (84)AREA – 10,026 m² GFA, including 5,347 m² GFA for the extensionSCOPE – Basic MOP missionFEATURE –...

“Cinéma Studio 6” Multiplex Cinema – Annemasse (74)

“Cinéma Studio 6” Multiplex Cinema – Annemasse (74)

NATURE – Construction of the “Cinéma Studio 6” multiplex cinemaCLIENT – SAS Ciné Studio / Groupe VirgilCOST – €5,670,000 excl. VATDATE – Delivered in 2021LOCATION – Annemasse (74)AREA – 3,376 m² usable floor area (UFA)SCOPE – Basic MOP mission + OPCENERGY PERFORMANCE...

“Ciné Cluses” Multiplex Cinema – Cluses (74)

“Ciné Cluses” Multiplex Cinema – Cluses (74)

NATURE – Construction of the “Ciné Cluses” multiplex cinemaCLIENT – SAS CinémondeCOST – €2,758,238 excl. VATDATE – Delivered 07/2020LOCATION – Cluses (74)AREA – 1,541 m² usable floor area (UFA)SCOPE – Basic MOP mission + visa + OPCENERGY PERFORMANCE – RT 2012...

Grenoble-St-Geoirs Airport – Saint-Étienne-de-Saint-Geoirs (38)

Grenoble-St-Geoirs Airport – Saint-Étienne-de-Saint-Geoirs (38)

NATURE – Extension and rehabilitation of Grenoble-St-Geoirs AirportCLIENT – CCI GrenobleCOST – €5,521,551 excl. VATDATE – Delivered in 2001LOCATION – Saint-Étienne-de-Saint-GeoirsAREA – Total 5,263 m² GFA: extension 3,232 m², renovation 2,387 m²SCOPE – Basic MOP...