Grenoble School of Management – Grenoble (38)

NATURE – Construction of an office tower and lecture hall for educational use – Grenoble School of Management

CLIENT – CCI Grenoble
COST – €10,443,886 excl. VAT
LOCATION – Grenoble (38)
AREA – 5,470 m²

SCOPE – Basic MOP mission + Execution studies + Cost control

FEATURE – Office tower connected to the existing business school – 490-seat lecture hall